First I want to strip four 25 litre washes, collecting down to 30%
This should get me about 20 litres at over 50%
Then water my strip back to 30% before figuring out how best to compress and remove the heads.
I'm thinking the required setup is to use my boka with a packed column, have the boka cooling on full and the takeoff valve wide open, then have a second CM style cooling coil above my packed column but below the slant plates with the water flow to the CM coil on full.
The method would then be to use as little power as possible and slowly reduce the water flow to CM coil allowing the vapour temp to slowly rise up to a point just below where I expect the hearts to start and hold it there by adjusting the CM water flow if required, until the output from the boka slant plates stops completely, in theory this is the vast majority of my heads removed.
I would then close the boka output value, turn off the CM cooling and allow the column to stabalise before opening my VM takeoff and collecting my hearts, still collecting in cuts but hopefully the majority of what I collect will be clean hearts
I'm open to any ideas if you think my method will work or if you can see a better way of removing headsStatistics: Posted by Anavrin — Fri Nov 07, 2014 10:03 am
]]>