









Statistics: Posted by ant — Fri Aug 22, 2014 4:50 pm
Statistics: Posted by YHB — Sun Sep 02, 2012 3:41 am
10mm pipe annealed and wound around the fire extinguisher the stainless ball bits came from.
annealing again to get the fit as close as possible.
Coils cut free and brazed.
Flange beaten flat against the ball half.
View from the other side
The two halves flanged and sat together
Marking two concentric circles across the two halves of 22mm ply with a 5mm oak face.
semicircle cut out on the table saw and smoothed down with a surform and then a rotary sanding cylinder in the battery drill.
Internal semicircle removed with the battery drill and a small hole cutter. Internal surface of clamp smoothed the same way as the outer.
Starting the groove with a slitting saw in the dremel
Then a cone shaped burr
Then a cone shaped grindstone
Finished profile of the groove
Clamp in place with the stainless hinge showing.
Still need to fit the swing bolt but the hard part is done now.Statistics: Posted by ant — Sat Sep 01, 2012 11:48 pm





Statistics: Posted by ant — Wed Aug 01, 2012 4:20 pm

Statistics: Posted by ant — Thu Jul 19, 2012 9:40 am

Statistics: Posted by Phantom — Wed Jul 18, 2012 1:59 pm
Statistics: Posted by YHB — Sat Jul 14, 2012 6:08 pm
Statistics: Posted by ant — Sat Jul 14, 2012 11:47 am
Statistics: Posted by ant — Tue Jul 10, 2012 9:46 am
Statistics: Posted by YHB — Mon Jul 09, 2012 7:30 pm
Statistics: Posted by ant — Mon Jul 09, 2012 5:17 pm


















Statistics: Posted by ant — Mon Jul 09, 2012 5:17 pm







Statistics: Posted by ant — Wed Jun 27, 2012 5:06 pm

Statistics: Posted by ant — Sat Jun 23, 2012 6:12 pm
Statistics: Posted by YHB — Sat Jun 23, 2012 4:36 pm