I don't know the pro's and con's of my suggestion, it has probably being suggested and tried before but I can't find anything.
After all that here goes.
We have just had our bathroom refitted, SWMBO decided it was time for a change.
The fitters laid the old hot water cylinder out the back and it got my grey matter ticking.
Firstly when all the connections are fitted it becomes a pressure vessel, there are ports to fit a heating element, it's made of copper, it's fully insulated and there is a secondary heat exchanger.
So:
Construction
1. We connect a heater element in it's socket at the bottom of the tank.
2. Place a drainage tap on the bottom pipe fitting (where the cold water feed would have been)
3. Connect the hot water feed (very top of tank) to the upper heater coil connection.
4. Connect a condenser to the lower heater coiler connection and drain to the collection vessel.
Operation (Maybe)
1. Remove the blanking cap where the upper electric heating element would fit and fill up. Put blanking cap back.
2. Switch on (obviously).
3. The unit will come up to temperature and start to produce vapour. This vapour will travel through the heating coil / exchanger starting to cool and condense whilst helping to heat the liquid in the unit.
4. Partially liquefied condensate will travel along through the "traditional" water cooled still into the collection vessel.
Cleaning Out
1. Open the filler point, for flushing water.
2. Open the bottom tap to drain off.
I am not in a position to try this as I am working overseas but was interested to hear any thoughts.
It's an idea, I'm new to this and it seemed plausible to me.
Please feel free to shoot me down I have probably made a glaring error, but I am interested in any feedback. (positive and negative)
That's it lunch over back to the sun and sand.Statistics: Posted by amaark — Mon Apr 29, 2013 10:12 am
]]>